Itasca County Rail Spur

Hammerlund Inc. is ready to serve you in all your general contracting needs. With our experienced work crews and modern equipment, we have the experience and know-how to see your project through with confidence and pride.

Itasca County Rail Spur

The Itasca county rail-spur was completed in 2009 for the Essar Steel Corporation on the Mesabi Iron Range. The project site was a narrow track, (averaging 120 feet wide), of red tinged earth spanning six miles. During the project Hammerlund Inc. and RJS Construction removed over 2.8 million yards of some of the toughest materials to work with in cut and fill excavation, including sugar sand, ledge rock, marsh excavation, and iron tailings.

With machines operating in runs of up to two miles long, work and equipment crews were able to keep cycle times to a minimum and proceeded efficiently, even during the spring thaw when maintaining hauling roads became a challenge.

  • Earthmoving With Efficientcy

    Twenty-two, forty ton articulated dump trucks were employed in this massive earth-moving project to help create a “from the ground up” steel production site which handles the mining of ore up to the actual production of rolled steel. The rail-spur site facilitates a steel-production operation that is a benefit to the local economy and Hammerlund Inc. is proud to have been a part in its creation.

  • With superior project management and the most innovative techniques implemented, we have built a company-wide mentality to move the most earth in the most effective and cost efficient manner possible.

  • Essar

    Hammerlund Inc. started with their first contract for Essar Steel in November of 2009 with the Railroad Corridor...

  • Highway 169

    The Highway 169 project in Grand Rapids was completed under demanding conditions requiring that only half the road could...

  • Mesabi Nugget

    Throughout the course of the project Hammerlund Inc. employed over 80 tradesman consisting of finishers, carpenters,...